WPL Prescibe The Correct Treatment
This £350k 'Design & Build' multi discipline Facade project demanded a variety of material applications, ranging from a Cable/Rod 316L St St Mesh Facade for the lower steet levels, PPC Aluminium Louvres for the upper levels, Galvanised Balustrade to the top areas, Perforated Aluminium panels on the stairwells to the interior and a Glass/PPC Steel Canopy to the front main entrance.
All where completed on schedule and within budget to the main contractor, Galliford Try's satisfaction.
This high profile, prime located installation is a credit to all involved.